Engineering Duty Log

Moderator: Kermie Mistwallow

Post Reply
User avatar
Twist Mechanique
Tribble
Posts: 40
Joined: 230414.0329
Duty Post: Resigned 240305
Ship/Station Posted:
Grid: 001 Second Life
Location: Washington, DC
Has thanked: 34 times
Been thanked: 18 times
Contact:

230704.0932

Engineers Log, Ensign Firebeard Reporting.


At present, all Colony systems are operating at normal capacity.

Commander Nakajima spent time investigating the potential for mining the Benemite and Dilithium from the caved in section near the old weather station.

Ensign Firebeard
Engineer, UFS Headquarters
Pinastri Colony

<Log Recording Ended>
<File Saved>
Last edited by Twist Mechanique on 230822.0748, edited 1 time in total.
User avatar
Twist Mechanique
Tribble
Posts: 40
Joined: 230414.0329
Duty Post: Resigned 240305
Ship/Station Posted:
Grid: 001 Second Life
Location: Washington, DC
Has thanked: 34 times
Been thanked: 18 times
Contact:

230808.1144

Chief Engineers Log, Lieutenant Firebeard Reporting.


I'd like to say that at present, all colony systems are operating normally, however an errant bit of code turned Commander Nakajima's coffee order into a coffee order plus several hundred hot bananas.

Power was reset on Commander Nakajima's personal replicator, and I removed the hot banana option on the menu.

I went to the other replicators on colony, and the code fragment had spread, so i repeated the process of power cycling by removing the panel and physically removing the connection to the replicator, and then reinserting it forcing a reboot and an update from the mainframe. I then removed the option for hot banana off of the menu and replaced it with something called hash brownies.

Commander Nakajima and I have scheduled a system reboot and restore at 1700 this evening.

Lt.(Jg) Firebeard
Chief Engineer, UFS Headquarters
Pinastri Colony

<Log Recording Ended>
<File Saved>
User avatar
Twist Mechanique
Tribble
Posts: 40
Joined: 230414.0329
Duty Post: Resigned 240305
Ship/Station Posted:
Grid: 001 Second Life
Location: Washington, DC
Has thanked: 34 times
Been thanked: 18 times
Contact:

230821.1416

Engineering Log - Chief Engineer
Stardate: 2308.08
Location: Pinastri Colony, Pinastri System, Delta Quadrant

Shift: 0800 - 2000 hours

Chief Engineer: Lieutenant (Junior Grade) Twist Firebeard

Entry 1: Stardate 2308.08, 0800 hours
Shift begins with a thorough inspection of the fusion reactor at the heart of our colony's power grid. Fusion containment levels stable, and power output within normal parameters. Auxiliary coolant pumps on Level 3 undergoing routine maintenance. Engineering team conducting diagnostics to ensure cooling efficiency.

Entry 2: Stardate 2308.08, 1000 hours
Routine maintenance on the primary coolant loop completed. Structural integrity fields calibrated throughout the colony's infrastructure. Reviewed energy consumption patterns over the last lunar cycle to optimize power distribution. Systems on all levels functioning nominally. Computer reports a minor energy fluctuation in the East Wing. Sending a team to investigate.

Entry 3: Stardate 2308.08, 1230 hours
Lunch break taken. Shift rotation minimizes the number of staff available during the mealtime. Water reclamation system on Level 2 experiencing elevated pressure readings. Engineering teams are addressing the issue. Investigation into energy fluctuation reveals a glitch in the phase harmonics modulator. Repaired and recalibrated to stabilize the energy grid.

Entry 4: Stardate 2308.08, 1500 hours
Engineering team assigned to conduct geological surveys of the surrounding area to assess any potential impact on the colony's stability. Monitoring seismic activity and tectonic shifts. Fusion reactor output momentarily dropped due to a magnetic containment field disruption. Restored to optimal levels after realignment of magnetic coils. Preparing for a system-wide energy demand surge during the next phase of the colony's expansion.

Entry 5: Stardate 2308.08, 1730 hours
Shift nearing its end. Structural integrity fields updated based on the geological survey data. Remote drone established to monitor seismic activity around the clock. Fusion reactor efficiency increased by fine-tuning plasma injector assemblies. Environmental control system on Level 2 registering temperature anomalies. We are addressing the issue.

Entry 6: Stardate 2308.08, 1930 hours
Final systems check completed. Transitioning night shift responsibilities to Beta Shift. Completed a review of power distribution plans for the upcoming expansion. Fusion reactor status remains optimal, ready to support increased energy demands. Structural integrity fields updated to reflect geological analysis. Tomorrow's tasks include reactor diagnostics, reactor core maintenance, and ongoing energy grid optimization.

End of Shift: 2000 hours
Shift concludes with all critical systems functioning within established parameters. Engineering team briefed on the tasks for the next shift. Colony remains well-prepared to sustain its energy needs and withstand any potential geological challenges.

Lt.(Jg) Firebeard
Chief Engineer, UFS Headquarters
Pinastri Colony

<Log Recording Ended>
<File Saved>
User avatar
Twist Mechanique
Tribble
Posts: 40
Joined: 230414.0329
Duty Post: Resigned 240305
Ship/Station Posted:
Grid: 001 Second Life
Location: Washington, DC
Has thanked: 34 times
Been thanked: 18 times
Contact:

231106.1251

Daily Log - Chief Engineer Lt. Firebeard
Date: 241106
Location: Pinastri VI Colony, Pinastri System

personal note: It's been a while since I've updated my duty log. We've been rather busy, with the intake of new recruits, and an away mission.

08:00 - 08:30: Began the day by checking the colony's daily maintenance reports from various departments, ensuring all systems are operating within standard parameters. Noted an anomaly in the environmental control system's energy consumption, which requires further investigation.

08:00 - 10:30: Conducted an inspection of the colony's main power plant, followed by a check of the newly installed T7 worker drone from Starfleet Headquarters. Verified that the drone's integration into the engineering team's tasks is progressing smoothly.

10:30 - 11:00: Participated in a teleconference with command staff to provide updates on the colony's engineering status. Discussed resource allocation and requested additional supplies for upcoming terraforming and expansion projects, including a request for maintenance supplies for the T7 drone.

11:00 - 12:00: Lunch break.

12:00 - 14:30: Worked on refining plans for the Science Annex office space for Administration. Collaborated with the construction team to ensure that the new space meets the administrative needs and is integrated into the existing infrastructure efficiently.

14:30 - 15:00: Prepared the daily engineering report, including updates on the T7 worker drone's performance, progress on the Science Annex office space, and all other relevant activities. Summarized the day's accomplishments and outlined plans for the next day's tasks.

15:00 - 16:30: Went through ASDB database for research purposes.

16:30: Ended the workday by making notes on any ongoing tasks and potential issues to be addressed in the following days. Returned to personal quarters to rest and recharge for the next workday.
Post Reply

Return to “Pinastri Colony - Crew Duty Logs”