230111 - You're Tearing me Apart!
Moderators: Aryela Dagger, Kinney Randt
- Moonprince Rhode
- Engineering - Fleet Captain
- Posts: 740
- Joined: 080119.1755
- Duty Post: Chief Engineer - USS Veracruz
- Ship/Station Posted: USS Veracruz
- Grid: Second Life
- Location: Mid West USA
- Has thanked: 14 times
- Been thanked: 3 times
- Contact:
=================================================================
United Federation Starfleet
USS Veracruz
NCC 200808
=/\=Official Mission Log as Per VADMR Kinney Randt=/\=
Chief Engineering Officer Moonprince Rhode-Randt-Mistswallow Recording
================================================================
== Prelude ==
Captain's Log:
Stardate: 230111
Alert Status: Green
With the destruction of the Romulan vessel posing as the USS Veracruz, command has ordered us to resume our normal patrol once we complete our investigation of the debris. It is my hope that this next patrol will be a little less eventful then our last one.
=============================================
In Service
Fleet Captain Moonprince Rhode-Randt Mistswallow
United Federation Starfleet
USS Veracruz
NCC 200808
=/\=Official Mission Log as Per VADMR Kinney Randt=/\=
Chief Engineering Officer Moonprince Rhode-Randt-Mistswallow Recording
================================================================
== Prelude ==
Captain's Log:
Stardate: 230111
Alert Status: Green
With the destruction of the Romulan vessel posing as the USS Veracruz, command has ordered us to resume our normal patrol once we complete our investigation of the debris. It is my hope that this next patrol will be a little less eventful then our last one.
=============================================
In Service
Fleet Captain Moonprince Rhode-Randt Mistswallow
- Moonprince Rhode
- Engineering - Fleet Captain
- Posts: 740
- Joined: 080119.1755
- Duty Post: Chief Engineer - USS Veracruz
- Ship/Station Posted: USS Veracruz
- Grid: Second Life
- Location: Mid West USA
- Has thanked: 14 times
- Been thanked: 3 times
- Contact:
*Crew Manifest*
CO: Vice Admiral Kinney Randt
XO: Rear Admiral Aryela Dagger
Chief Science Officer: Fleet Capt Scottybrit "Skot Brit" Resident
Chief Operations Officer: Capt Fred McCellan
Chief Engineer: Fleet Capt Moonprince Rhode-Randt
Vice Chief Engineer: Fleet Capt Gron Syntron (Zimri Zapatero)
Chief Security Officer: Cmdr Kristoff Jameson
Chief Medical Officer: Capt Rodneymmckay "Rodney McKay-Sheppard" Resident
**Guest Stars**
Science Officer Ensign Ady Vaar (adaminia)
CO: Vice Admiral Kinney Randt
XO: Rear Admiral Aryela Dagger
Chief Science Officer: Fleet Capt Scottybrit "Skot Brit" Resident
Chief Operations Officer: Capt Fred McCellan
Chief Engineer: Fleet Capt Moonprince Rhode-Randt
Vice Chief Engineer: Fleet Capt Gron Syntron (Zimri Zapatero)
Chief Security Officer: Cmdr Kristoff Jameson
Chief Medical Officer: Capt Rodneymmckay "Rodney McKay-Sheppard" Resident
**Guest Stars**
Science Officer Ensign Ady Vaar (adaminia)
- Moonprince Rhode
- Engineering - Fleet Captain
- Posts: 740
- Joined: 080119.1755
- Duty Post: Chief Engineer - USS Veracruz
- Ship/Station Posted: USS Veracruz
- Grid: Second Life
- Location: Mid West USA
- Has thanked: 14 times
- Been thanked: 3 times
- Contact:
=============================================
United Federation Starfleet
USS Veracruz
NCC - 200808
=/\= After Action Damage Report =/\=
=============================================
Stardate: 230111
Warp Drive:
ETA: 4 hours
Priority: 2
Repair Team Assignment: Repair Team Beta under command of Fleet Captain Moonprince Rhode-Randt.
Notes: Micro fracture in primary deuterium injector supply line. Need diagnostic check of all warp drive components due to nature of warp field collapse.
Impulse Drive:
ETA: N/A
Priority: N/A
Repair Team Assignment: N/A
Notes: No damage reported.
EPS Power Grid:
ETA: 10 hours
Priority: 3
Repair Team Assignment: Repair Teams Alpha 1.
Notes: Secondary EPS Tap needs replaced and system recalibrated.
Life-support:
ETA: N/A
Priority: N/A
Repair Team Assignment: N/A
Notes: No damage reported.
Tactical systems:
ETA: N/A
Priority: N/A
Repair Team Assignment: N/A
Notes: No damage reported.
Internal and External Sensor Arrays:
ETA: 2 days
Priority: 4
Repair Team Assignment: All available teams.
Notes: Module damage detected in several lateral arrays caused by microfractures in the external hull. Modules will be repaired as hull damage is fixed.
Structural Integrity system/Hull:
ETA: 4 days
Priority: 1
Repair Team Assignment: All available teams not assigned to other repairs.
Notes: Due to the gravitational anomaly we discovered, there is over 6000 microfractures all along the external hull. All certified EVA teams will be used to repair and replace the hull as needed. Overload in SIF generator 2 and 7.
Computer systems:
ETA: N/A
Priority: N/A
Repair Team Assignment: N/A
Notes: No damage reported.
Communication System:
ETA: N/A
Priority: N/A
Repair Team Assignment: N/A
Notes: No damage reported.
End Log
United Federation Starfleet
USS Veracruz
NCC - 200808
=/\= After Action Damage Report =/\=
=============================================
Stardate: 230111
Warp Drive:
ETA: 4 hours
Priority: 2
Repair Team Assignment: Repair Team Beta under command of Fleet Captain Moonprince Rhode-Randt.
Notes: Micro fracture in primary deuterium injector supply line. Need diagnostic check of all warp drive components due to nature of warp field collapse.
Impulse Drive:
ETA: N/A
Priority: N/A
Repair Team Assignment: N/A
Notes: No damage reported.
EPS Power Grid:
ETA: 10 hours
Priority: 3
Repair Team Assignment: Repair Teams Alpha 1.
Notes: Secondary EPS Tap needs replaced and system recalibrated.
Life-support:
ETA: N/A
Priority: N/A
Repair Team Assignment: N/A
Notes: No damage reported.
Tactical systems:
ETA: N/A
Priority: N/A
Repair Team Assignment: N/A
Notes: No damage reported.
Internal and External Sensor Arrays:
ETA: 2 days
Priority: 4
Repair Team Assignment: All available teams.
Notes: Module damage detected in several lateral arrays caused by microfractures in the external hull. Modules will be repaired as hull damage is fixed.
Structural Integrity system/Hull:
ETA: 4 days
Priority: 1
Repair Team Assignment: All available teams not assigned to other repairs.
Notes: Due to the gravitational anomaly we discovered, there is over 6000 microfractures all along the external hull. All certified EVA teams will be used to repair and replace the hull as needed. Overload in SIF generator 2 and 7.
Computer systems:
ETA: N/A
Priority: N/A
Repair Team Assignment: N/A
Notes: No damage reported.
Communication System:
ETA: N/A
Priority: N/A
Repair Team Assignment: N/A
Notes: No damage reported.
End Log